Project: Solar-Wind-Heat Hybrid Power Station (SWH-HPS)

Capacity: 1–3 MW (modular and scalable)
Location: Bishkek, Kyrgyzstan
Project stage: Design and budgeting documentation (pre-construction)
Sector: Renewable Energy / Green Technology / Future Power


🧩 Project Overview

The SWH-HPS (Solar-Wind-Heat Hybrid Power Station) is a unique renewable energy system with no global analogues. It integrates three sources of green energy: solar, wind, and heat, allowing for electricity generation even when sunlight, wind, or flowing water are absent.

Applications:

  • Generation of green electricity

  • Backup or main power supply for Data Centers (DCs)

  • Powering cryptocurrency mining farms

  • Production of green hydrogen fuel


⚙️ How It Works

The station converts energy from:

  • Solar power — through concentrated sunlight using optical systems

  • 💨 Wind — starts operating from as low as 1 m/s (conventional turbines need 3 m/s)

  • 🌡 Heat from water — any static water tank can be used (rivers not required)


🌟 Advantages of SWH-HPS

  • ⚡ Produces electricity in all weather conditions

  • 🔋 Efficiency over 45% (higher than traditional plants)

  • 🏗 Short construction time: 9–12 months

  • 💲 Low installation cost: $2–3 million per station

  • 🌱 Fully green and eco-friendly

  • 🔇 Low noise emission

  • 🏙 Compact size — can be installed directly at consumption sites (factories, urban zones)

  • 💧 Heat reuse for hot water and heating


💼 Economic Metrics and Investment

Phase Investment Needed
R&D, prototype, testing $6 million
Mass production (100 units/month) $200 million
  • Total project budget: $206 million

  • Target production: 1000 stations per year

  • Expected annual revenue: $3 billion

  • ROI period: within 3 years

  • Factory space required: 25 hectares

  • Jobs created: 300


🤝 Requirements for Implementation

  • Government support: land, preferences, infrastructure

  • Large investor or co-investment partner

  • Certification for international markets

  • Distribution partnerships in energy-deficient countries

Project: Multipurpose Vessel “Kyrgyzstan”

The “Kyrgyzstan” is a next-generation multipurpose vessel designed for both sightseeing transport (up to 250 passengers) and luxury-class cruises (20 cabins for 40 passengers). The catamaran combines advanced eco-technologies, hybrid propulsion, and lightweight durable materials.


⚙️ Technical Specifications

Parameter Value
Length 36.00 m
Beam (Width) 9.00 m
Draft ~1.5 m
Height overall 8.00 m
Displacement (full) 150 tons
Max speed 35 knots
Cruising speed 20 knots
Range 600 nautical miles
Autonomy 10 days
Crew 5 persons
Max passengers 250 persons
Hull material Aluminum alloy (AMg), composite
Engine power 4000 kW

🔋 Hybrid Energy System

The vessel features a hybrid propulsion system that includes:

  • Electric propulsion motors

  • Generators

  • Use of renewable energy sources (RES) such as solar panels

  • Energy-efficient battery storage

This results in lower fuel consumption, reduced emissions, and a more environmentally friendly operation.


🚀 Innovations and Features

  • Controlled hydrofoils for reduced drag and increased speed

  • Air cushion effect for better hydrodynamic efficiency

  • Lightweight, corrosion-resistant construction using composite and aluminum materials

  • Convertible interior layout: sightseeing or cruise mode


🛳 Advantages of the “Kyrgyzstan” Vessel

  • Excellent balance of speed, efficiency, and comfort

  • Eco-friendly navigation with hybrid energy

  • High autonomy and seaworthiness

  • Ideal for tourism, intercity river or lake transport

  • Promotes innovative national shipbuilding

Все катера имеют возможность высадки пассажиров на не подготовленный берег, обладают большой скоростью, экономичностью и дальностью плавания, удобными пассажирскими креслами на открытых и закрытых палубах, с большими панорамными окнами. Основное преимущество катеров — это наличие экологически чистой гибридной энергетической установки с использованием возобновляемого источника энергии. Использование в них «Зелёной» энергетики позволит бережно относится к экологии Иссык-Куля, даст толчок в развитии туризма, водного и железнодорожного транспорта, круглогодичного пассажирского сообщения между городами Бишкек, Балыкчи, Тамчи (Аэропорт), Чолпон-Ата, Бостери, Тон, Кара-Кол, Каджисай, Боконбаево, туристические прогулки между северным и южным берегом и как следствие круглогодично заработают пансионаты и санатории. 

Производство уникальных катеров, не имеющих аналогов в мире, создаст квалифицированные рабочие места, обеспечит развитие старых и новых отраслей промышленности, приведёт к освоению технологий композитного производства, автоматических систем управления, производство роботов, инновационных технологий, что даст развитие всей экономики Кыргызстана. 

Особая специальная технология производства, заложенная нами в данные проекты, позволит иметь большой экспортный потенциал и спрос во многих странах мира, а также поднимет престиж страны на мировой арене!

Отрасль: Судостроение
Партнеры (соинвесторы, заказчики и т.д.): 
Количество рабочих мест в кооперации: 1000 человек
Стадия реализация проекта: проектно-сметная документация 

Общий бюджет проекта: 

  • Разработка РКД, двух опытных образцов, испытание: - 12 млн $  
  • Серийное производство (максимальная мощность производство 10 катеров в год) - 60 млн $
  • Валовая прибыль с 1 катера = 1 млн $
  • Годовой доход при выпуске 10 катеров = 10 млн $

    Горизонт планирования: 3 года
    Мощность производства: 10 катеров в год
    Место расположения: Кыргызстан г. Балыкчи, г. Бишкек.

Кооперация: г. Санкт-Петербург, г. Зеленодольск.
Площадь необходимой производственной площадки: 15 Га

Условия, необходимые для реализации инвестиционного проекта (поиск потенциального партнера, со финансирование, получение государственных преференций, оказание иных форм государственной поддержки): - Государственная поддержка, либо крупный инвестор.

 